Basant 2027

Overheads per kite type

Each kite size carries its own cost instead of a single average. The fixed cost is what one kite costs to make; the variable overhead is the share of running costs you want every kite of that size to carry. Both feed the profit tracker.

Cost per kite

Fixed and variable, by size

Full cost Rs 0 a kite · 1,380 kites recorded · Rs 0 in total

Full cost Rs 0 a kite · 1,977 kites recorded · Rs 0 in total